When construction ripped up portions of the fiber cable operating Cranberry’s centrally-controlled traffic signal system, Traffic Operations Manager Marty McKinney installed point-to-point radio connections to bridge the gaps. The Township’s solution is featured in a recent issue of the trade publication Thinking Highways.